Friday, April 19, 2019
Construction Law Essay Example | Topics and Well Written Essays - 1250 words
Construction Law - Essay illustrationAs the contractor was excluded from the goal stage so the employer retains the risk for any mistakes or errors in the end (Gerrard, 2012). On the other hand, in the Design and Build procurance, the contractor is assigned the responsibility for both, aim and construction by the employer. All the Design and Build strategies have the same parameter, that the contractor will run short prudent for design and construction of the project at a given point of time for a fixed amount of money. The client/employer is required to seek professional help for preparing a detailed direction of requirements before signing a contract with the contractor. Thereafter, the contractor will be liable for design, labour, solid which will lead to a single point of responsibility. The contractors efficiency will escalate as he exercises control over design and construction. Moreover, any arguments over design will be amidst the contactor and professionals instead of the employer and professionals. 1.(b). Engineers are going to be appointed by the employer or contractor depending on the procurement model. A chief engineer should be nominated if several engineers from various fields are to be appointed. Engineers should be given authority and access if the design is based on a process of technology, to which the employer holds licence. nether the standard build procurement, an engineer is required to meet the employers needs for inviting tenders. On the other hand, in a design and build procurement, the role of an engineer is based on providing a performance specification, standards for material input and design which will be include in the Works Specification (NEC Contract, 2012). To be more precise, a structural engineer is responsible for designing the anatomical structure of a building together with drain and installation. He will also provide professional and expert opinion to the client about the structure and cost of every part of t he building. His work must co-ordinate with the architect and operate engineer. A services engineers role is to design and identify mechanical and electrical services keeping in view the employers specifications. They are to provide advice on matters like environmental issues, sustainability and cost. Following novation, engineers will be responsible to the contractor instead of the employer (APUC, 2012). 1.(c). Compensation circumstances are those which do not arise because of a default on the contractors part and therefore entitle him to compensation in price and time. A choice forecast is used to assess the impact of any compensating event on cost and time. Compensation event pass through notification, quotation, revision and implementation stages. An event should meet the criteria mentioned in Clause 60 of NEC3 to be treated as a compensation event (Eggleston, 2006). Clause 60(1) states that A Project Manager gives an breeding changing the works information except a. A chang e made in order to strike a defect or b. A change to Works Information provided by the Contractor for his design which is made either at his request or to comply with other Works Information provided by the Employer. In this scenario, the Employer has instructed the Contractor to provide a design on an arch detail which was not included in the original
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.